The cold storage belongs to a kind of refrigeration equipment. Compared with the refrigerator, its refrigeration area is large, but they have the same refrigeration principle. So how to maintain the cold storage every day. Today I'll introduce how to do a good job in the daily management and maintenance after the installation of the cold storage.When the valve is opened too large or too small, the fresh-keeping warehouse will lead to too large or too small refrigerant flow, reduced refrigeration efficiency and even equipment damage.Connect the refrigeration system. Wires and copper pipes shall be used to connect the refrigeration unit, electric control system and other components of the cold storage. The connecting pipes shall be closely connected, and corresponding thermal insulation and protection measures shall be taken.Quotation sheet,The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection, loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in - days, The library body can be combined, separated or increased or decreased according to the needs of users.Installation of cold storage, construction of cold storage, fruit preservation cold storage and medical cold storage have stable, safe,TomazoCold storage installation manufacturer, reliable and maintenance free performance. The technical level has reached the domestic level and the advanced level of similar international products. If there is a large amount of ice and water, it must be cleaned in time, and it must not be knocked during cleaning, so as not to damage the ground and affect the service life of the cold storage.First, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse boards, so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel, and the two sets of connecting pieces shall be fixed on the upper, outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, it shall be about mm wide. If it does not meet the requirements, remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter, pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron,TomazoInstallation of aluminum bar in cold storage, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.
The ground insulation of small, medium and large cold storage is different, which is closely related to the purpose, storage products and size of cold storage. Kuhua refrigeration reminds: ground insulation must be done, otherwise the temperature in the cold storage often fluctuates frequently due to poor insulation performance, which affects the quality of stored goods. So, what is the difference between the ground insulation of small, medium and large cold storage? How to do better?Equipment maintenance, - precautions for vertical plate of cold storage: vertical plate displayDisadvantages: high precision requirements, shape and position tolerances are in micron level; No exhaust valve poor off design performance; The working chamber is not easy to implement external cooling, and the heat in the compression process is difficult, so it can only compress the gas with small adiabatic index or internal cooling; Large displacement scroll refrigeration unit is difficult to realize. The receiving teeth are high, the displacement is large, the diameter is large, and the unbalanced rotation mass increases.What should be considered in building a cold storage? In these aspects, meets the needs of refrigeration technology, convenient production,The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.Judge the operating sound of the compressor, and carefully listen to the operating sound of water pump, cooling tower, timely warranty is required fan and other equipment. In case of abnormal sound, so as to avoid greater damage to the compressor due to untimely warranty.The new cold storage material is made of rigid polyurethane or polystyrene foam insulation sandwich panel which is made by high pressure foaming process and can be made into various lengths and specifications to meet the different requirements of the users.
Qisheng Electromechanical Equipment Co., Ltd. 2023-01-27 08:53:19 support 0 | be opposed to 0
Professional contracting of earthwork engineering 2023-01-27 09:13:10 support 0 | be opposed to 0
Testing equipment 2023-01-27 08:28:30 support 0 | be opposed to 0