Caibarien Seamless pipeMarket prices are mixed

263HP145816628   ·  2022-06-07 13:12:02   ·   Electronic Component

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,Caibarien Seamless pipe, aerated silicification method and electric double liquid silicification method.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.

Caibarien Seamless pipeMarket prices are mixed


According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground,Caibarien Steel pipe,Caibarien Grouting pipe, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.Caibarien Seamless pipeMarket prices are mixed,2022-06-0713:14:16The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method alkali solution method, high chemical grouting method and cement grouting method.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.

Caibarien Seamless pipeMarket prices are mixed


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.According to the sequence of sectional construction along the stratum depth, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.Caibarien ,Horn Ames,It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, pipe leakage and the joint between the ground wall.

4 Replies   |  until 2022-06-07 13:12:02 | 178 Views

Apex Wooden Door Company 2022-06-07 15:19:25 support  0 | be opposed to  0

I just received it this morning and I like it very much. I'll come next time, can you introduce a friend to buy Caibarien Seamless pipe for a discount?

Gas Energy Company 2022-06-07 13:48:38 support  0 | be opposed to  0

This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this Caibarien Seamless pipe. They explain to me patiently. It is really the conscience of the industry. I want to recommend this shop to my friends and let them all come to this shop to buy clothes!

Construction and installation of solar photovoltaic power generation equipment 2022-06-07 14:21:48 support  0 | be opposed to  0

Ha ha. Caibarien Seamless pipe It’s here so soon, it’s not bad, next time you come, you can ask for a discount ^_^
Log inContent can only be published later