DresdenSmall cold storage installation companyHow to conduct stress testing

632HP195506591   ·  2024-04-21 04:51:22   ·   energy

Panel types of quick freezing warehouse: color plastic steel plate salted steel plate, stainless steel plate, embossed aluminum, etc.Core tip: in the cold storage project only with sufficient cold storage installation skills can we ensure that the cold storage is more energy-saving and power-saving after installation, and is not prone to failure, convenient use and management and long service life.Dresden,Condensation pressure if the condenser has poor heat transfer, the condensation pressure will increase and the cooling power will decrease. For cooling, power consumption increases. If the configuration of the cooling system is too small, the heat transfer capacity will be insufficient, resulting in high condensation pressure.The assembled cold storage body often adopts double-sided color steel plate of polyurethane thermal insulation material, which has excellent thermal insulation performance, storage and circulation effect and reduces operation energy consumption. Of course, more important is the choice of refrigeration system. For example, at present, the refrigeration system of fluorine refrigerant is still the mainstream, but when selecting the type and power of cooling equipment, it is necessary to calculate the data for the installation of cold storage and then make a high-quality choice.Murcia,Cold storage is mainly used for frozen processing and storage of foodFor cold storage, it is very common in our production and life. Cold storage is very important for food freezing and preservation, but its energy consumption is very large in the use of cold storage. How can we solve this problem?The equipment configuration is reasonable and the service life of the quick freezing warehouse is long. The reasonable equipment configuration of the quick freezing warehouse can greatly prolong the service time of the quick freezing warehouse. Some compressors are easy to be damaged when they work at full load for a long time, so we try to use screw parallel units. The great advantage of this unit is that it can turn on all equipment, just like the shift at work, so that the compressor can work and rest in turn.


DresdenSmall cold storage installation companyHow to conduct stress testing



Different food processing technical processes for the construction of cold storage are combined with local urban planning. The construction of cold storage is the design requirements and construction of cold storage, which not only avoids the cross pollution between foods but also ensures its transportation facilities: within the construction scope, a reasonable overall layout, saves land and reduces costs.During the welding of refrigeration pipeline, a blowdown outlet shall be reserved to blow the sewage from high and low pressure with nitrogen in sections. After the sectional blowing is completed, the whole system shall be blown until no dirt is found. The blowdown pressure is .MPa.Reasonably adjust the cold storage evaporator and defrost in time: Generally speaking, every ℃ increase in the evaporation temperature of the cold storage can save energy by ~ . Therefore, on the premise of meeting the refrigeration process of the product, the liquid supply can be adjusted to increase the evaporation temperature as much as possible.production,Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt, drill a hole at the corresponding elevation in the middle of the plate width. When drilling, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron, and tighten it horizontally, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor, the plane position of the wallboard and the verticality of the storehouse should be adjusted in time according to the location of the laying line, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.Refrigeration system: refrigeration system is the core part of cold storage design. It is the key to determine the economy, environmental protection and performance of cold storage.The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body, and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating, good waterproof performance, fire and high temperature resistance, strong overload capacity, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel,DresdenHow to make a small cold storage,DresdenPharmaceutical reagent cold storage, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, and the rivet spacing in the warehouse should be mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.


DresdenSmall cold storage installation companyHow to conduct stress testing



All wiring shall be neat. All switches and keys shall be opened and closed sensitively, reliably and accurately. Special connectors shall be used for wiring, and power protection shall be provided for the box and each power branch.Create brilliance,The selection of equipment for the construction of equipment cold storage is closely related to the size, and the carbon oxide is released due to the respiration of vegetables. If the accumulation is too high, it will have an adverse effect on the storage of vegetables. Therefore, ventilation device or air washing device is designed in the general warehouse.After the cold storage at the corner is installed, the next cold storage can be installed along the direction of the corner. Adopt the similar installation of Zhang cold storage to install the thermal insulation board of the storage. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage, advanced technology, more affordable price and more preferential. Welcome to consult. Pay attention to its compactness and continuous uniformity.Dresden,The butt joint between the top warehouse plate and the end of the top warehouse plate shall be treated to prevent air leakage and cold running. After all the top warehouse plates are installed, the butt joint shall be filled with foaming material, and the mm wide color steel plate shall be sealed at the butt joint with pull riveting.The cold storage board uses light polyurethane as the inner material of the cold storage board. The advantage of polyurethane is that the thermal insulation performance is very good. The exterior of polyurethane cold storage board is composed of SII, PVC color steel plate and stainless steel plate. The advantage of this is to prevent the temperature transmission of cold storage board due to large internal and external temperature difference, so as to make the cold storage more energy-saving and improve the working efficiency of cold storage.Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling,DresdenInstallation of small freezer, load-bearing, antifreeze, moisture-proof, etc.

4 Replies   |  until 2024-04-21 04:51:22 | 66 Views

zealt cleaning services ltd. 2024-04-21 12:44:13 support  0 | be opposed to  0

You DresdenSmall cold storage installation company are okay, give a discount next time you buy, and buy your company's DresdenSmall cold storage installation company

Machinery and equipment sales 2024-04-21 12:54:24 support  0 | be opposed to  0

After so many years of online shopping, this is the first time I have taken this seriously. I was holding my phone and staring at the screen with a sense of anxiety, and I dared not start. In order to write a notarized evaluation of DresdenSmall cold storage installation company, send four characters, high quality and low price. This is my happy online shopping, thank you!

Research and development of elevator intelligent equipment 2024-04-21 11:54:51 support  0 | be opposed to  0

DresdenSmall cold storage installation company Not bad, the price is worth it, just right.

Research and development of electronic engineering equipment 2024-04-21 07:05:45 support  0 | be opposed to  0

DresdenSmall cold storage installation company Very good, I will order yours for the next batch.
Log inContent can only be published later