TrojansTransformer and box type substationIndustry market in-depth research and development prospects, investment feasibility

122HP117294921   ·  2022-12-28 08:20:32   ·   Machinery and industry equipment

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.In the case of dry-type transformer operation, there is more noise, and some even cause noise, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.Trojans,Visual inspection method for transformer inspectionThe noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building and then causes gas vibration noise, the dispersion spacing and adverse effects are very large.Villa Angela which is then scattered to the ears of consumers. Although the amount of noise is not very large,When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Therefore,TrojansHow much is the transformer, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Dry type transformer manufacturer


TrojansTransformer and box type substationIndustry market in-depth research and development prospects, investment feasibility



If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time,TrojansTransformer and box type substation, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P is the input power and P is the output power.Noise pollution control and prevention measures of dry-type transformerRecommendation and consultation,After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.When the full load test is carried out and everything is normal,TrojansType of dry-type transformer, the load can be connected.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, investment feasibility' >



In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?Packaging strategy,& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).How to make up oil for oil immersed transformer?Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.Trojans, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

5 Replies   |  until 2022-12-28 08:20:32 | 158 Views

Jianxing Aluminum & Plastic Steel Company 2022-12-28 08:26:23 support  0 | be opposed to  0

I want to change a supplier and see you on the Internet, can I give a detailed explanation TrojansTransformer and box type substation

Afforestation seedlings 2022-12-28 09:29:01 support  0 | be opposed to  0

The manager is nice! TrojansTransformer and box type substation is also real.

Agricultural technology research and development 2022-12-28 10:46:09 support  0 | be opposed to  0

It's worthy of praise, really good, TrojansTransformer and box type substation I like it very much.

rubber seal 2022-12-28 09:16:45 support  0 | be opposed to  0

TrojansTransformer and box type substation Very good, but the logistics company is slower, but the product is very good, o(∩_∩)o...

Grid support 2022-12-28 09:33:15 support  0 | be opposed to  0

The logistics is very fast, look forward to working together again
Log inContent can only be published later