Vega500 KVA oil immersed transformerEnergy saving in sewage treatment

122HP117294921   ·  2022-06-30 12:42:04   ·   Machinery and industry equipment

When the power transformer operates at full load, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Vega,Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core,VegaProcurement of dry type transformers, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Power transformerAbbotsford,In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly and the harm will not expand to a greater extent.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


Vega500 KVA oil immersed transformerEnergy saving in sewage treatment



When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.Price,(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it and a warning sign shall be hung at a prominent position.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Manufacturing process and steps of dry-type transformer


Vega500 KVA oil immersed transformerEnergy saving in sewage treatment



Noise solution of dry-type transformerFree consultation,The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, large current flow and small characteristic impedance into high communication AC voltage small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core), causing the magnetic induction voltage in the primary coil (or current).In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.Vega,Fault judgment of power transformerNoise dispersion of dry-type transformerThe zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified,Vega800 box type transformer, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

5 Replies   |  until 2022-06-30 12:42:04 | 400 Views

Building materials market enjoys building materials company 2022-06-30 14:42:44 support  0 | be opposed to  0

After looking for the Vega500 KVA oil immersed transformer from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

construction equipment 2022-06-30 13:42:09 support  0 | be opposed to  0

Thank you faithfully, let me buy the dream Vega500 KVA oil immersed transformer, thank you so much!

Prepreg 2022-06-30 13:23:47 support  0 | be opposed to  0

Follow you Vega500 KVA oil immersed transformer for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected. The boss praised it.

oxygen 2022-06-30 15:00:24 support  0 | be opposed to  0

Brother, with your support, this new model Vega500 KVA oil immersed transformer is indeed up to standard and very good.
Log inContent can only be published later