Dubrovnik480v dry type transformerSignificantly improved technical level

122HP117294921   ·  2023-01-09 08:07:42   ·   Machinery and industry equipment
source, sampling date, sampling person weather conditions and other materials of the oil sample.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness,In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as ,DubrovnikState Grid transformer won the bid, providing subsidies of - yuan / KVA for energy-saving transformers.Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Rio Gallegos,Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Power transformer manufacturerIf the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.


Dubrovnik480v dry type transformerSignificantly improved technical level



The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate),Dubrovnik20 kV oil immersed transformer, it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom or it can be replaced by changing the oil.demand,The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:


Dubrovnik480v dry type transformerSignificantly improved technical level



Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.Standard requirementsOil immersed transformerRight, as & ldquo; Great Lars car & rdquo;, After replacing one kva small transformer, the utilization rate is close, but the main parameters of the two transformers are evaluated as shown in Table . Table evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer,DubrovnikAmorphous alloy transformer and oil immersed transformer, It actually consumes electromagnetic energy.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Dubrovnik,When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

3 Replies   |  until 2023-01-09 08:07:42 | 136 Views

Longteng Waste Car Recycling and Dismantling Company 2023-01-09 09:03:40 support  0 | be opposed to  0

Just bought Dubrovnik480v dry type transformer, the quality workmanship is even worse. Look back and introduce to friends

Chemical products and import and export 2023-01-09 08:19:22 support  0 | be opposed to  0

Just bought Dubrovnik480v dry type transformer, the quality workmanship is even worse. Look back and introduce to friends

lighting equipment 2023-01-09 09:14:41 support  0 | be opposed to  0

The logistics is very fast, look forward to working together again
Log inContent can only be published later