ozark 32lead small conduitTips on industry operation

965HP113924865   ·  2024-05-08 00:51:37   ·   Building materials

The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken,ozark Price of advanced small conduit, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the grouting shall be carried out slowly and evenly without interruption, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.ozark ,Inner diameter: mm; Outer diameter: mm; Inner diameter tolerance: ± .mm; Length of each roll: m.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.Chernofze,How heavy is a grouting pipe? It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in China


ozark 32lead small conduitTips on industry operation



Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.When installing the Hainan grouting pipe, carefully check the embedded reinforcement in the groove before the joint is lowered. If cracks or breaks are found, the position is improper or the gap is too large, remedial measures must be taken.Answer: it varies according to the model and elasticity of the grouting pipe, and its internal pressure can reach bar or more.Where can I find it?,They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete.The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?


ozark 32lead small conduitTips on industry operation



The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Industry management,It is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, it forms an efficient stress transmission mechanism, so that the local load can quickly and effectively spread to the large area of soil, so as to reduce the local failure stress and improve the service life of the project. The convex joint steel plastic grouting pipe is an upgraded product of the ordinary steel plastic grouting pipe, which changes the shortcomings of the ordinary grouting pipe such as the small peeling force of the joint (n), the easy cracking of the welding point, the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology the peeling force of the welding joint is between N and N, which effectively changes the above shortcomings of the traditional steel plastic grouting pipe. Because of the protruding joints at the welding position, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment, polyethylene (PE) and other additives, and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, it is a high-strength reinforced geotextile. This single belt is woven or sandwiched at a certain distance longitudinally and horizontally, and is formed by welding its junction with the fusion welding technology of special reinforcement bonding. The grouting pipe is set out from the inner ring tap in the vertical setting out state,ozark Advance small conduit in stock, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, the formwork shall be cut with plate shears,ozark 32lead small conduit, edge folding machines, profile training machines, etc. the blanking standards shall be used for rebar concealment and cross slab. The unqualified ones shall be rectified until they meet the construction technology. Concrete pouring Before concrete mixing, the moisture content of sand and stone shall be measured and the construction mix proportion shall be adjusted according to the test results.?ozark , Classification of grouting pipe grouting pipe the grouting pipe is a plane mesh material of grouting pipe with certain flexibility. The main raw material is polyethylene grouting pipe. It is extruded into thin sheets by a grouting pipe extruder, and then punched with regular holes. Then it is made by directional stretching under the control of heating. It can be divided into unidirectional grouting pipe and bidirectional grouting pipe according to the different stretching modes when it is manufactured.In the construction of some grouting pipes after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.If any crack is found, it shall be repaired in time, otherwise, when the joint is deformed and subjected to water pressure the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available, the method of hot vulcanization connection can be used.?


2 Replies   |  until 2024-05-08 00:51:37 | 42 Views

Antique architectural engineering design 2024-05-08 08:45:33 support  0 | be opposed to  0

Just paid, when will ozark 32lead small conduit arrive, boss.

Grid support 2024-05-08 08:08:54 support  0 | be opposed to  0

Follow you ozark 32lead small conduit for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected. The boss praised it.
Log inContent can only be published later