OstanderTunnel leading small conduit and pipe shedTeach you how to maintain

965HP113924865   ·  2024-04-14 02:02:59   ·   Building materials

General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center. performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel, is acid-base resistant, corrosion-resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance and mechanical scars such as scratches and crushed stones will produce stress concentration, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.Ostander, Permanent sealing can be ensured after grouting. If there is no leakage, grouting can be omitted.In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.Horten,The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use. Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of soil load, it is a mechanism of dispersing the force on each hole belt and forming a resultant force.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning,OstanderLeading small conduit production, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.


OstanderTunnel leading small conduit and pipe shedTeach you how to maintain



At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple fast construction and low investment. During concrete construction, special personnel shall be assigned to take care of the reserved and embedded reinforcement, formwork and water and electricity to prevent deformation and displacement. In addition, the calendering of the component surface and the roughening of the laminated plate surface shall be carried out in time.At the same time,Ostander50lacrimal duct, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.Quality improvement,It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.?When the pipe cannot be connected due to serious blockage, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, from the perspective of saving steel consumption so there is generally no need to restrict the thickness of the pipe wall. However, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.


OstanderTunnel leading small conduit and pipe shedTeach you how to maintain



Classification of grouting pipe grouting pipe the grouting pipe is a plane mesh material of grouting pipe with certain flexibility. The main raw material is polyethylene grouting pipe. It is extruded into thin sheets by a grouting pipe extruder,The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission,OstanderSeamless small conduit, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Foshan Shengda building materials introduction product advantages Simple installation complete set; The grouting pipe can be intercepted at the construction site according to the actual required length of the joint (it is recommended that the longest grouting outlet length should not exceed m); No special installation equipment is required; Grouting time can be arbitrarily selected; When grouting is carried out internally under the pressure, the grouting pipe liquid can keep uniformly filling the whole pipe; The system allows grouting under relatively low pressure; The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; tenThe existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.Ostander,In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole. The length can be matched according to the construction requirements without loss. After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.


3 Replies   |  until 2024-04-14 02:02:59 | 54 Views

Deyitang Dafang Co., Ltd. 2024-04-14 09:52:30 support  0 | be opposed to  0

Let me talk about the quality of the goods first: OstanderTunnel leading small conduit and pipe shed Overall it is good, and the packaging is tight. Let’s talk about business services: Like it. Last review express: delivery is fast. The other is to thank the store for discounts, after all, cheap and good products are more real. I hope that the store will give more discounts and notify old customers in time to promote repurchase. I wish business prosperous.

Manufacture and installation of transmission and control equipment 2024-04-14 09:08:56 support  0 | be opposed to  0

OstanderTunnel leading small conduit and pipe shedHow much is it, can I transfer the goods?

Operation and maintenance service 2024-04-14 09:31:09 support  0 | be opposed to  0

Cooperation with you is really good, OstanderTunnel leading small conduit and pipe shed good quality, come to our company again if you have time.
Log inContent can only be published later