SitaCar mounted aluminum alloy lifting platformRelease signal

275HP127226562   ·  2024-03-24 00:45:19   ·   Machinery and industry equipment

Drop test to check if the braking interval of the safety governor meets the requirements of the rules. Equipment transfer maintenance: Check the coupling between the electric motor and the worm gear reducer and dismantle the gearbox. Clean all components and seals, replace excessively worn and deformed parts and smooth oilWhen disassembling the hydraulic oil tank filler cap, filter cover, hydraulic oil pipe and other parts, it is necessary to avoid dust during the system oil passage. The disassembled parts must be thoroughly cleaned before opening. When disassembling the hydraulic oil tank filler cap first remove the soil around the tank cap. After loosening the tank cap, remove any remaining debris from the joint area (do not rinse with water to prevent water from seeping into the tank). Only after confirming cleanliness can the tank cap be opened. When using materials and hammers, materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned, dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, although the filter element is intact, it may also be unclean). When changing the oil, clean the filter at the same time. Before installing the filter element, carefully clean the bottom dirt inside the filter housing with materials.Sita, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece and use the manual function of the equipment to test the vibration. It is determined that around revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.Check the smooth steel wire rope and various fasteners, if there is excessive wear, it is necessary to replace themSkopje,Knowledge of pressure lifting platforms, boarding bridges, mobile elevators, and more is available in Jiuheng, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory, cooperate and negotiate, and seek common development. The following maintenance and upkeep are required for the lifting cargo elevator: Maintenance and upkeep: Maintenance and upkeep should be carried out by the equipment operator or full-time personnel of the operating unit. The equipment maintenance and upkeep unit is responsible for supervising and reviewing the maintenance content. The main content of maintenance and upkeep is summarized as follows:; quot; Cross operation method; quot;: Clean, tighten, and prevent corrosion. Before and at the end of each shift adjust, to minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, pay attention to the sound of mechanical operation, and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for management  ?? The supervision unit shall effectively fulfill its safety responsibilities,SitaMaintenance of aluminum alloy hydraulic lifting platform, and if any potential production safety accidents are found, it shall require the installation unit and the user unit to rectify within a specified period of time. If the installation unit and the user unit refuse to rectify, they shall promptly report to the construction unitCheck the protective cable condition of the cable guide frame


SitaCar mounted aluminum alloy lifting platformRelease signal



Check and repair the electrical circuit and control panel switch components. If there is aging in the circuit, replace itPower supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.Knowledge of pressure lifting platforms, boarding bridges, mobile elevators, and more is available in Jiuheng, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory, cooperate and negotiate, and seek common development. The following maintenance and upkeep are required for the lifting cargo elevator: Maintenance and upkeep: Maintenance and upkeep should be carried out by the equipment operator or full-time personnel of the operating unit. The equipment maintenance and upkeep unit is responsible for supervising and reviewing the maintenance content. The main content of maintenance and upkeep is summarized as follows:; quot; Cross operation method; quot;: Clean, tighten, smooth, adjust, and prevent corrosion. Before and at the end of each shift, to minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, pay attention to the sound of mechanical operation,SitaLarge fixed lifting platform, and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for managementWelcome calls ,The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components, the friction surface is rough, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, in turn acts as abrasive and continues to participate in friction, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period, it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.Manganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect, a layer of rust resistant primer is usually applied,SitaMobile boarding bridge, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.Check the safety interlocking equipment of the first cut door of the hanging cage


SitaCar mounted aluminum alloy lifting platformRelease signal



Regularly check all wires and cables for damage. Timely bandage and replace damaged parts.Professional is king, with an oil temperature between and ℃. Use a large flow rate to remove impurities from the system as much as possible. The hydraulic system needs to be cleaned repeatedly three times or more. After each cleaning, fully drain the system while the oil is hot.The arrangement of vibration points should be based on the vibration aging process standard GB/T-. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.Since the antirust paint on the exterior layer will actively react with the oxygen in the air, especially in the cold sun or rainstorm climate, the reaction speed will be accelerated, so the exterior paint on the warehouse goods elevator will show signs of aging and then fall off every once in a while. Therefore, when maintaining the equipment of the lift table at ordinary times, pay attention to its storage, and try not to leave it outdoors, let alone in cool days or rainstormSita,  Check and repair the electrical circuit and control panel switch components. If there is aging in the circuit, replace itClean and inspect the crown wheel frame assembly, correct or replace with new parts


4 Replies   |  until 2024-03-24 00:45:19 | 18 Views

Shibei Road Maintenance Team 2024-03-24 09:04:33 support  0 | be opposed to  0

SitaCar mounted aluminum alloy lifting platform Delivery is really fast, too efficient, the product has been received, give you a good comment.

Optical cable fittings 2024-03-24 09:51:12 support  0 | be opposed to  0

SitaCar mounted aluminum alloy lifting platformThe quality is good, completely beyond expectations, and the delivery speed is very fast.

winding pipe 2024-03-24 09:24:16 support  0 | be opposed to  0

After my personal experience, the reputation of this store is quite good. SitaCar mounted aluminum alloy lifting platform The quality is more like a diamond. Thank you so much!

Installation and Maintenance 2024-03-24 08:54:11 support  0 | be opposed to  0

SitaCar mounted aluminum alloy lifting platform How's the market trend recently, do you know anything?
Log inContent can only be published later