LiegeMobile aluminum alloy lifting platformAnalysis of Causes of Blockage Failure and Discussion of Solutions

938HP166090698   ·  2024-04-25 03:26:38   ·   Machinery and industry equipment
in order to determine the configuration of certain shared devices

To implement the arrangement of escalators and provide feedback, the order of shipment, and the alignment of handrail turns during continuous arrangement.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Liege,Overloaded elevators do not operate: The load of elevators is limited, and if they are overweight, they will alarm and generally cannot be started. Most passengers can also voluntarily exit.Brick concrete structure elevator shaft: For unfinished brick structure shafts, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersThe safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.


LiegeMobile aluminum alloy lifting platformAnalysis of Causes of Blockage Failure and Discussion of Solutions



The call button on each floor is no longer working, and the call is cut off.Household elevators have gradually become an essential vertical transportation tool for modern single family, duplex, multi story, villa and other residential buildings, practical and convenient, and even a beautiful scenery in the home.The call button on each floor is no longer working, and the call is cut off.Inspection requirements,The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, which is beneficial for reducing noise, but there should be no protruding foreign objects.


LiegeMobile aluminum alloy lifting platformAnalysis of Causes of Blockage Failure and Discussion of Solutions



In the event of a fire when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Executive standard,Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Home elevators are different from public spaces, such as professional home elevators, villa home elevators, home elevator manufacturers,LiegeAccessible lifting platform, small home elevators, and other special products. Old brands have advantages in price and guaranteed quality. Considering the limited installation space, lack of dedicated hoistways, and small lifting height, the design pursues simplicity and miniaturization,LiegeResidential use of indoor elevators in duplex buildings, and the existence of computer rooms is not necessary. Long term promotion of home elevator manufacturers, old brands, price advantages, and guaranteed quality!The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.Liege,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width etc.), then consider the non-standard design of the elevator.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.


5 Replies   |  until 2024-04-25 03:26:38 | 64 Views

hong sheng trading co. 2024-04-25 10:45:11 support  0 | be opposed to  0

The level of the seller MM is very high, and the people are very patient. I saw a lot of LiegeMobile aluminum alloy lifting platform, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

One Nine One Nine E-Commerce Company 2024-04-25 11:26:16 support  0 | be opposed to  0

It’s really a test and waiting. I finally waited for 3 days LiegeMobile aluminum alloy lifting platform to arrive, the opening quality is very good

Yuanxia Cashmere Products Company 2024-04-25 12:51:30 support  0 | be opposed to  0

LiegeMobile aluminum alloy lifting platform I received it, the seller delivered the goods very quickly, the logistics is also very good, the customer service attitude is excellent, very patient, giving people a kind of intimacy, and I really like it. There are also exquisite packaging and high-end atmosphere. It can be seen that the merchants are very careful. LiegeMobile aluminum alloy lifting platform It's really good, it matches the picture, there is no difference, it is really good value for money.

Theatrical performances 2024-04-25 10:34:58 support  0 | be opposed to  0

It’s really a test and waiting. I finally waited for 3 days LiegeMobile aluminum alloy lifting platform to arrive, the opening quality is very good

Audio equipment 2024-04-25 12:45:45 support  0 | be opposed to  0

I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online LiegeMobile aluminum alloy lifting platform, thank you!
Log inContent can only be published later