HartwanSemi electric high-altitude reclaimerWhat is the factory way

938HP166090698   ·  2024-04-25 02:12:57   ·   Machinery and industry equipment

Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Hartwan,The elevator suddenly opens the door and does not move after leveling, but automatically resumes operation after a few minutes: The elevator (escalator) has been running for too long, and the motor overheats. To prevent burning out, the motor cools down and automatically resumes operation.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Masallatah,The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


HartwanSemi electric high-altitude reclaimerWhat is the factory way



Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted,HartwanRotating lifting stage, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant waterproof, sturdy and durable, be careful not to step on the gap between the pedals, as not wearing shoes is more likely to be pinched by the toothed plate.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, return to the first floor station, and automatically open the elevator door if it is in the upward direction.discount,The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesMultiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.


HartwanSemi electric high-altitude reclaimerWhat is the factory way



Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis,HartwanAluminum alloy mobile lifting platform, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Design brand,The call button on each floor is no longer working, and the call is cut off.The gantry elevator is used in the door legs of large gantry cranes to transport workers and maintenance components inside the gantry craneWhen the normal power supply is cut off the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Hartwan,Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.If the elevator is in a downward direction, immediately close the door and return to the first floor station, and automatically open the elevator door.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.


3 Replies   |  until 2024-04-25 02:12:57 | 59 Views

Transit Cleaning & Cleaning Company 2024-04-25 09:53:10 support  0 | be opposed to  0

HartwanSemi electric high-altitude reclaimer The quality is not bad, and the goods are delivered in time. I recommend you to buy it next time.

Water Filtration Equipment and Accessories 2024-04-25 10:28:43 support  0 | be opposed to  0

It's rare to buy HartwanSemi electric high-altitude reclaimer, I saw such a good store. The price is very favorable, the service is also very good, and the things are good. Give me a good encouragement this time.

High pressure wall bushing 2024-04-25 09:30:12 support  0 | be opposed to  0

The quality is very good, exactly the same as the seller’s description, very satisfied, really like it, completely exceeding expectations, the delivery speed is very fast, the packaging is very careful and strict, the logistics company’s service attitude is very good, the delivery speed is very fast, and I am very satisfied One time shopping.
Log inContent can only be published later