The key reason for oil leakage is that there are defects in cast iron partsThe cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.Celingawi,It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation,CelingawiPower converter transformer, and overload is not allowed in the whole process of operation.Lucaya,Seal oil leakageMethod and process of taking oil sample of power transformerPower transformer
Therefore, in the operation prevention and regulation of relay protection dry-type transformer it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.The efficiency of transformer is closely related to the output power level of transformer. Generally, the smaller the loss to output power ratio and the higher the efficiency. On the contrary the smaller the output power, the lower the efficiency.() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.Market trend,Oil leakage at electric welding positionThe heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Oil leakage of porcelain pot and laminated glass oil level gauge
Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.consumption,It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, so as to achieve the pressure management of oil leakage.Visual inspection method for transformer inspectionThe noise of dry-type transformer comes fromCelingawi,Oil leakage of bolt or pipe external threadThe vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment,CelingawiRecovery price of dry-type transformer, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.
Maimang E-Commerce Company 2024-04-24 08:35:25 support 0 | be opposed to 0
Dongxiao Power Technology Co., Ltd. 2024-04-24 09:24:23 support 0 | be opposed to 0
Except futures consultation 2024-04-24 10:09:20 support 0 | be opposed to 0
electrical components 2024-04-24 09:13:17 support 0 | be opposed to 0