ProvMobile aluminum alloy lifting platformHow to improve overall efficiency

938HP166090698   ·  2024-03-13 05:50:00   ·   Machinery and industry equipment
the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, and other parameters.Prov,Elevators are used to transport firefighters, passengers, they need to meet the requirements of sealing the door leaves and guide rails at the moving parts. Professional household elevators, villa household elevators, household elevator manufacturers, and small household elevators have stable, safe, reliable, and maintenance free performance, and their technical level has reached the domestic level, Meet the advanced level of international similar products and immersion requirementsThe shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Leirvik,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.If the elevator is in a downward direction immediately close the door and return to the first floor station, and automatically open the elevator door.


ProvMobile aluminum alloy lifting platformHow to improve overall efficiency



Restore the command button function in the cabin for firefighters to operate.Overloaded elevators do not operate: The load of elevators is limited, and if they are overweight, they will alarm and generally cannot be started. Most passengers can also voluntarily exit.The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.agent,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.


ProvMobile aluminum alloy lifting platformHow to improve overall efficiency



The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long,ProvHydraulic stage elevator, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Management Department,  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width etc.), then consider the non-standard design of the elevator.The elevator suddenly descends to the bottom floor and resumes normal operation: After the elevator is powered off and reconnected the leveling reference position needs to be re determined.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected,ProvAluminum alloy mast type lifting platform, refueled,ProvStage hydraulic lifting platform, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Prov,Restore the command button function in the cabin for firefighters to operate.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.The call button on each floor is no longer working, and the call is cut off.


3 Replies   |  until 2024-03-13 05:50:00 | 51 Views

Jiamu Trading Company 2024-03-13 13:40:40 support  0 | be opposed to  0

ProvMobile aluminum alloy lifting platformHow much is it and how can I sell it?

Rubber accessories 2024-03-13 13:34:16 support  0 | be opposed to  0

Just paid, when will ProvMobile aluminum alloy lifting platform arrive, boss.

Engineering labor subcontracting 2024-03-13 12:56:46 support  0 | be opposed to  0

ProvMobile aluminum alloy lifting platform The quality is very good, the transfer has been received, the boss is troubled, thank you very much!
Log inContent can only be published later