DandmondOil immersed transformer monitoringTransformation and application

122HP117294921   ·  2023-04-29 01:45:20   ·   Machinery and industry equipment
How to make up oil for oil immersed transformer?The main reason is that the welding quality of electric welding is poor

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.On load commissioning:Dandmond, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.AnshanThe whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!On load commissioning:Noise pollution control and prevention measures of dry-type transformer


DandmondOil immersed transformer monitoringTransformation and application



Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way,DandmondModel of power dry-type transformer,Solenoid insulation deteriorationWhen oil samples are used,DandmondThree phase temperature of dry-type transformer, the safety and fire safety technical specifications on the spot shall be strictly implemented.The tap changer of power transformer shall also have strong insulation. kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.


DandmondOil immersed transformer monitoringTransformation and application



Dry type transformerhow much,The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil,DandmondPower transformer insulation, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.Oil leakage at looper flangeDandmond,Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Careless maintenance and insulation damage(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.

0 Replies   |  until 2023-04-29 01:45:20 | 98 Views
Log inContent can only be published later