milkMaintenance price of oil immersed transformerRecognized by customers

122HP117294921   ·  2022-06-12 22:11:17   ·   Machinery and industry equipment

After no-load test run is normal for h, and the load shall be gradually increased from %, % and % by grade.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time check whether the equipment has abnormal sound,milkDry type transformer equipment, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.milk,Visual inspection method for transformer inspectionThe technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Lugo,For no-load impulse closing of transformer, pay attention to the following matters:Loose core screw(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it and a warning sign shall be hung at a prominent position.


milkMaintenance price of oil immersed transformerRecognized by customers



Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area,milkInstallation requirements for indoor oil immersed transformer,milkTotally enclosed oil immersed transformer, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.TransformerThe vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Discount, source, sampling date, sampling person, weather conditions and other materials of the oil sample.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


milkMaintenance price of oil immersed transformerRecognized by customers



() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.device management,Falling foreign matters and piercingThere is a magnetic induction line crossing in the transformer core, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.milk,The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, sampling date, sampling person, weather conditions and other materials of the oil sample.What about oil immersed transformer fire?

2 Replies   |  until 2022-06-12 22:11:17 | 161 Views

kansen car co., ltd. 2022-06-12 23:16:50 support  0 | be opposed to  0

milkMaintenance price of oil immersed transformer Not bad, the price is worth it, just right.

Terminal box 2022-06-13 07:02:01 support  0 | be opposed to  0

To live up to the boss's expectations of me, I will definitely write down my own evaluation objectively, fairly and truthfully, milkMaintenance price of oil immersed transformer is indeed very good, thank you!!!
Log inContent can only be published later