Sihu 3 meter electric elevatorSurface treatment process

935HP175192871   ·  2023-05-26 04:15:47   ·   Machinery and industry equipment
Sihu Niuli brand electric elevator,

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into V, V or V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.Sihu ,The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.When the landing door is closed, the full width of the lifting passage opening should be covered.Myeik,There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least . meters.Construction electric elevators outside the lightning protection rangeProtective measures should comply with regulatory requirements.


Sihu 3 meter electric elevatorSurface treatment process



The wall bracket of the construction electric elevator should be intact and reliably fixed,Sihu Aluminum alloy electric elevator, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet,Sihu Freight elevator electric elevator, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit,Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors or other lower suspended structures, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.Focus on Development,High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds % of the rated load capacity, the overload detection device will give a warning signal inside the cage,Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Sihu Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement


0 Replies   |  until 2023-05-26 04:15:47 | 73 Views
Log inContent can only be published later