Cape BretonSmall conduit manufacturerHow to reasonably improve the performance of

965HP113924865   ·  2023-01-07 09:43:40   ·   Building materials

The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, that is, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial,[] in one embodiment as shown in Fig. , the flange I is used for the installation and connection of the utility model and the underground grouting pipe. The fast cutting device of the utility model rotates the bolt by using the fastening force acting on the bolt, and the fixed cutting device can be moved up and down through the screws on the bolt. There are screw patterns on the outer surface of the cutting rotary device and on the upper end of the tension blade device The tension blade nut can be directly screwed to one end of the tension blade device A cutting blade and a pulley are fixed to the lower end of the cutting rotary device , and the outer diameter of the cutting rotary device is smaller than the inner diameter _ of the sleeve. The specification of the utility model can be made into a series of products according to different specifications of the grouting pipe. The saddle shaped curved surface on the horseshoe surface of the grouting pipe and the upper and outer molds are not well fitted, which is caused by the Chengdu grouting pipe manufacturer&#;s failure to smooth (flatten) the grouting pipe along the horseshoe surface.Mutare,The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?The use of grouting pipes has become indispensable in modern building construction, ranging from super high-rise and high-rise buildings to multi-storey buildings and indoor decoration construction. China has a longer history of using grouting pipes. Many of China&#;s ancient buildings have been listed as world-class material and cultural heritage, because China&#;s ancient buildings are very technical in construction. In China, before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.


Cape BretonSmall conduit manufacturerHow to reasonably improve the performance of



The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe. Push the rock powder and sundries that have not been washed, remain at the bottom of the hole, or stick to the hole wall beyond the grouting range, so as to improve the bonding strength and impermeability of the slurry stone body and the fissure surface.When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe.How much is it,General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard,Cape BretonAdvance support small conduit, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.Two convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes, which plays a double safety sealing effect.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.


Cape BretonSmall conduit manufacturerHow to reasonably improve the performance of



Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration,Cape Breton42 small catheter, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceTest method,The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.Inner diameter: mm; Outer diameter: mm; Inner diameter tolerance: ± .mm; Length of each roll: m.Plastic pipe plastic pipe has a low acoustic impedance, which is used as a grouting pipe and has a large acoustic transmission rate. It can usually be used for smaller cast-in-place piles. It should be cautious when used in large-scale cast-in-place piles - because large-diameter piles need to be poured with a large amount of concrete, and the hydration heat of cement is not easy to dissipate. In view of the great difference between the thermal expansion coefficient of plastic and concrete the plastic pipe will shrink radially and longitudinally due to the temperature drop after concrete solidification, It may be separated from the concrete locally to cause air or water crevices, which is easy to cause misjudgment.Cape Breton, The length can be matched according to the construction requirements, without loss.The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of,Cape BretonGrouting seamless pipe, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.Disposal method: the grouting pipe shall be shortened according to the specification.


2 Replies   |  until 2023-01-07 09:43:40 | 156 Views

Tourism product sales 2023-01-07 09:55:45 support  0 | be opposed to  0

I will find you again next time I have the opportunity.

electrical components 2023-01-07 11:40:47 support  0 | be opposed to  0

Cape BretonSmall conduit manufacturer It can be said to be top-notch, and the details are perfect.
Log inContent can only be published later