Abu DhakaGrouting pipeDemand is gradually picking up, and China is expected to get out of the downturn

263HP145816628   ·  2023-01-05 03:43:38   ·   Electronic Component

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

Abu DhakaGrouting pipeDemand is gradually picking up, and China is expected to get out of the downturn


After the grouting hole is drilled,Abu DhakaPrecision tube, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.Abu DhakaGrouting pipeDemand is gradually picking up, and China is expected to get out of the downturn,2023-01-0503:43:38Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting,Abu DhakaGrouting pipe, pile foundation grouting pipe, grouting pipe manufacturer old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.The secondary grouting pipe can only be grouted once and cannot be reused.

Abu DhakaGrouting pipeDemand is gradually picking up, and China is expected to get out of the downturn


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,Abu DhakaSeamless pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.Abu Dhaka,Ferntree Gully,Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe steel flower pipe grouting, pile foundation grouting pipe, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.

0 Replies   |  until 2023-01-05 03:43:38 | 74 Views
Log inContent can only be published later