Tony kapanInstallation drawing of oil immersed transformerWhat are the factors that affect the selection of categories

122HP117294921   ·  2022-06-11 20:38:14   ·   Machinery and industry equipment

When leaving the factory, in some casesIt can be seen from the above that from the perspective of power saving, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: . The transformer load rate and power saving will be brought into the formula: the load index of the transformer, the operating load and rated capacity of the transformer . Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, and the rate is large when the specific copper loss is equivalent to iron loss.Power transformer manufacturerAr Rutbah,Tony kapanDry type transformer setting requirements,The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large,Tony kapanParameters of oil immersed power transformer, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.


Tony kapanInstallation drawing of oil immersed transformerWhat are the factors that affect the selection of categories



Brief introduction of zero line of power transformerUnder normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, resulting in short circuit between coils, two-color short circuit or short circuit on the ground resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.agent,The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection,Tony kapanOil immersed dry type transformer, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.Oil leakage of cast iron parts


Tony kapanInstallation drawing of oil immersed transformerWhat are the factors that affect the selection of categories



Manufacturing process and steps of dry-type transformerProduct range,In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P is the input power and P is the output power.In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitTony kapan,Power transformerThe noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.

5 Replies   |  until 2022-06-11 20:38:14 | 131 Views

Oxutong Power Equipment Sales Company 2022-06-11 22:07:45 support  0 | be opposed to  0

The seller is really good, Tony kapanInstallation drawing of oil immersed transformer is the same as the introduction, honest seller

Grain and oil purchase, sale and storage 2022-06-11 22:31:50 support  0 | be opposed to  0

The level of the seller MM is very high, and the people are very patient. I saw a lot of Tony kapanInstallation drawing of oil immersed transformer, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

Engineering preparation 2022-06-11 22:24:03 support  0 | be opposed to  0

Finally got Tony kapanInstallation drawing of oil immersed transformer So happy that! The workmanship is great.

Production of carbon fiber woven cloth 2022-06-11 21:03:33 support  0 | be opposed to  0

This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this Tony kapanInstallation drawing of oil immersed transformer. They explain to me patiently. It is really the conscience of the industry. I want to recommend this shop to my friends and let them all come to this shop to buy clothes!

Processing SMC molded products 2022-06-11 22:58:59 support  0 | be opposed to  0

I will buy it in the future Tony kapanInstallation drawing of oil immersed transformer and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!
Log inContent can only be published later