LearSelf propelled hollow grouting anchor manufacturerHigh quality and low price

965HP113924865   ·  2024-04-19 02:39:08   ·   Building materials

How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany Italy, Britain and other countries, up to now, metal skeleton and various rubber composite sealing strips sealing strips of various composite structures, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material, which has the characteristics of thin pipe wall, steel saving, impermeability, pressure resistance and high strength, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However, attention should be paid to the balance of its axis during installation.Lear Grouting: connect the grouting equipment, grouting pump and the lowered grouting pipe, conduct grouting according to the requirements, and inject the slurry into the soil through the grouting pump. After completing the construction of one grouting section, move the grouting pipe upward or downward as required to carry out the construction of the next grouting section.The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.Wesselsbron,The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, and the grouting pipe of steel strand bundle of the grouting pipe. For thick reinforcement, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time, which are often arranged in a ring or circle, or in a rectangle. Obviously, due to the different number and arrangement of prestressed reinforcement, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion.The arrangement of the strain gauge shall be installed before the prestressing force is applied and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.Answer: Yes, the elastic extension speed of the grouting pipe can be defined within a certain range in the design, but for a grouting pipe that has been designed, its elastic extension speed is certain.


LearSelf propelled hollow grouting anchor manufacturerHigh quality and low price



The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.Grouting pipe is a kind of embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints, the PVC end grouting pipe merchants set on the surface can choose to ship at a fair price to reduce the purchase when the future market trend is not clear, and the inventory of grouting pipes has decreased slightly. Affected by insufficient demand, the transaction has been tepid, and the daily turnover is basically below tons. At present, the steel price may have reached the bottom, and there is limited room for decline in the later period. The future price may still be dominated by maintaining stability. Affected by the fact that Bagang has delivered less resources recently, some local specifications are out of stock, and businesses are also reluctant to sell. However, the overall structural adjustment pressure of the steel industry is obvious, and there are downside risks to economic growth. In addition, the overall performance of the manufacturing industry is still relatively sluggish, and the price policy of first-line steel mills in October also maintained a stable but declining tone. At present, the overall fundamentals of the steel market remain negative. Near the end of the month, the pressure of the grouting pipe steel traders to withdraw funds and the tightening tone of the central bank&#;s monetary policy kept the overall liquidity tight. In addition, the differentiation of cold and hot-rolled price trends combined with the decline of the overall profitability of the current steel industry will make steel mills or increase their power to produce current star products. Therefore, we still need to be vigilant about the hot-rolled market, and there will not be much reversal in the short term. From the performance of the internal and external markets, the game between the long and short sides is prominent, and the short side increases the price, which makes the iron ore market rise and touch the wall. It is expected that the iron ore will maintain the interval fluctuation state in the near future and the fluctuation space of the grouting pipe is limited. This method can seal the joint. The grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. Manufacturing method of fast cutting device in the hole of underground grouting pipe [Patent Abstract] the utility model discloses a fast cutting device in the hole of underground grouting pipe, which is mainly composed of a fixed cutting device , a tension blade device and a cutting rotation device . The tension blade device is sleeved in the cutting rotation device. The tension blade device and the cutting rotation device are connected by threads, A blade tightening nut is arranged at one end of the tightening blade device extending out of the cutting rotating device. The cutting blade and pulley are fixed and installed on both sides of the cutting rotating device. The utility model is arranged in the grouting pipe, which reduces the operating intensity of workers by using the lead screw principle. The rotary cutting in the casing reduces the quantities of clearing the tunnel floor; The cutting depth can also be adjusted at will according to the actual situation of the roadway. The working efficiency is - times higher than that of manual cutting, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories,LearAdvance small conduit for tunnel, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, lateral and combined displacement of the pipe due to thermal deformation,LearAdvanced small conduit factory, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, which can reduce the deformation of the pipe and improve the service life of the pipe.Promise and keep promise,Answer: it varies according to the model and elasticity of the grouting pipe, and its internal pressure can reach bar or more.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.


LearSelf propelled hollow grouting anchor manufacturerHigh quality and low price



The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.Interpretation and observation, The grouting pipe is used as the pipe for grouting at the bottom of the pile. The test shows that the bearing capacity of the cast-in-place pile treated with the pile bottom grouting can be greatly improved At the same time, the grouting pipe can also be used as the pipe for the defect washing and grouting treatment of the accident pile. At this time,LearGrouting flower tube, it is necessary to take measures to punch the pipe at the defect position where grouting is required. The classification of the grouting pipe can be divided into three categories according to the pipe materials: the advantages of steel pipe steel pipe are that it is easy to install, and it can be welded on the reinforcement frame by electric welding, which can replace part of the reinforcement section, and because of the large rigidity of the steel pipe After embedding, the parallelism and straightness can be basically maintained. At present, the price of steel pipe is relatively expensive: steel corrugated pipe steel corrugated pipe is a better grouting pipe material. It has the characteristics of thin pipe wall, less steel, pressure resistance, high strength and good flexibility. It is usually used for post tensioning reserved holes in prestressed structures: when used as grouting pipe. It can be directly bound to the reinforcement framework soil, and the joint can be connected with a larger corrugated sleeve. Since the bellows is light, it is very convenient to operate, but attention should be paid to keeping its axis straight during installation.The cement grouting method is applicable to the grouting of gravel layer and rock fissure. Ordinary portland cement is generally used, the water cement ratio is :, and % ~ % water glass can be added as the accelerator. Ordinary extrusion mortar pump is used for grouting, and the maximum grouting pressure shall not exceed MPa. For silty fine sand and cohesive soil with permeability coefficient less than -cm / s, split grouting can be adopted. The consistency of the cement slurry used for split grouting is large, and the water cement ratio is . ~ .. Flower tube method and one-way valve tube method are adopted for grouting. The maximum pressure of grouting is generally greater than MPa.Answer: Yes, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.Lear, After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, vibrators etc.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistance


0 Replies   |  until 2024-04-19 02:39:08 | 10 Views
Log inContent can only be published later