WellsPrecision tubeWeak market and poor shipment

263HP145816628   ·  2023-05-07 01:59:57   ·   Electronic Component

The secondary grouting pipe can only be grouted once and cannot be reused.It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

WellsPrecision tubeWeak market and poor shipment


A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle, the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them, the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.WellsPrecision tubeWeak market and poor shipment,2023-05-0701:59:57Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,WellsGrouting pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.

WellsPrecision tubeWeak market and poor shipment


Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting,WellsPrecision tube,WellsSteel pipe, pile foundation grouting pipe, grouting pipe manufacturer, old brand, the pipe core and the outer wall of the pipe shall be washed clean.Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section,Petropavlovsk especially the slurry stop plug.Wells,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

0 Replies   |  until 2023-05-07 01:59:57 | 76 Views
Log inContent can only be published later