LexAWhere is a large cold storageAre there any requirements for the direction of enterprise development

632HP195506591   ·  2024-04-22 02:34:22   ·   energy

Insufficient refrigeration dose and capacity in the system: there are two main reasons for insufficient refrigerant circulation,Because polyurethane sheet has excellent thermal insulation performance, it can reduce the thickness of building envelope and increase indoor use area under the same thermal insulation requirements.LexA,Frosting of evaporator will increase thermal resistance and decrease heat transfer coefficient. For the cooling fan, the air circulation cross-sectional area is reduced, the circulation resistance is increased, and the power consumption is increased. Therefore,LexAInstall a small cold storage, defrost in time. Pay attention to the maintenance of the evaporator of the controlled atmosphere storage system. If the evaporator frosts, it will affect the normal use of the controlled atmosphere storage. How to defrost in time? The current scheme of the controlled atmosphere storage includes: manual defrosting, which is simple and easy, and has little impact on the storage temperatureThe importance of regular oil discharge, descaling and air discharge in the refrigeration system of the warehouse.Karshi,The physical properties of polyurethane insulation board are relatively good, which can meet different needs. The polyurethane insulation board is also strict in the selection of materials. It is a special product manufacturing enterprise integrating R & D, and service. It has long been specialized in cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage and medical cold storage. It improves the overall performance of the polyurethane insulation board and enables the polyurethane insulation board to work for a long time, Polyurethane insulation board has also become one of the main exterior wall materials.Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling,LexACold storage design and installation manufacturer, load-bearing, antifreeze, moisture-proof etc.The wide, light and thin walls are made of rigid polyurethane foam at the same time as structural materials, making the whole structure have the advantages of light weight, large span and high load. The thinner polyurethane sandwich plate can meet the relevant provisions on building energy consumption limit which allows the use of thinner plates during construction and saves building space.


LexAWhere is a large cold storageAre there any requirements for the direction of enterprise development



After being stored in the medical cold storage project, ventilating medical products may also emit some odors. Once these odors are stored in a certain quantity, they will also have a certain impact on other products. Therefore, we must carry out regular ventilation in the process of daily use, so as to effectively reduce the storage time of products. If the medical cold storage project uses row tube refrigeration, the image of frosting may appear after use for a period of time. If we do not defrost in time, I hope you must pay attention to defrosting.If the cold storage is in the building the load-bearing of the cold storage should be considered. That is, after the fruit is loaded in the cold storage, whether the floor can bear such weight.The three-dimensional automatic cold storage adopts a computer, unloading and stacking in the storage, the control of storage temperature and the operation of refrigeration equipment.Recommendation and consultation,Other aspects: in the design process of food cold storage it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.For the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.Thermal insulation rigid polyurethane has low thermal conductivity and good thermal performance. When the density of rigid polyurethane is ~ kg / m, which is the lowest among all thermal insulation materials at present.


LexAWhere is a large cold storageAre there any requirements for the direction of enterprise development



On the basis of cold storage and preservation, the quick-frozen warehouse increases the regulation of gas composition, delays their metabolic process, better maintains the freshness and commercial quality of fruits and vegetables, and prolongs the storage period and shelf life of fruits and vegetables. Generally, controlled atmosphere storage of fruits can prolong the storage period by & mdash; Three times or more. OK, what is the standard of quick freezing warehouse?Which one is better,When opening and drilling is required for the top warehouse plate or wall plate, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, and the opening and drilling shall be carried out after review; The inlet hole, liquid inlet hole, return hole, water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets, with a spacing of mm and mm outside.The selection of wires shall have a safety factor, and the temperature of the wire surface shall not exceed ℃ during unit operation or defrosting.Cold storage,LexAProfessional installation cold storage installation, compressor overload, lack of refrigerant, low pressure too low, excessive air intake, compressor jamming.LexA,Proper protective measures shall be taken during transportation to prevent plate from being strangled and scratched.The combined cold storage door starts frequently or does not start for a long time, or does not stop for a long time, or stops before the storage temperature reaches.The overall construction achievements of the cold storage project have been put into use, and the service life can reach years.

0 Replies   |  until 2024-04-22 02:34:22 | 61 Views
Log inContent can only be published later