If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %),Le Muller1600KVA dry type transformer size, it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Common problems of tap changer of power transformerLe Muller,At rated power, i.e. & ETA; Is the efficiency of the transformer; P is the input power and P is the output power.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Falkenberg,Oil immersed transformerThe power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).
Connection group structure of dry-type transformerThis is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline,Le MullerPower transformer bidding, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.device management,When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.Noise solution of dry-type transformer
Operation and maintenance management of oil immersed transformerSafety production,The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Le MullerAfter tightening the loose bolts, and solve the bolts that are likely to leak seal the flange, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.Deterioration damage of transformer core insulationAvoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.
cutting tool 2022-06-08 07:19:48 support 0 | be opposed to 0
Electric energy metering box 2022-06-07 22:20:05 support 0 | be opposed to 0
Processing SMC molded products 2022-06-08 07:27:51 support 0 | be opposed to 0
Shelves 2022-06-07 23:35:04 support 0 | be opposed to 0
570HP155642700 2022-06-07 22:36:15 support 0 | be opposed to 0