PeristriInspection items of oil immersed transformerDefense against varying degrees of chemical variation

122HP117294921   ·  2023-05-04 07:01:34   ·   Machinery and industry equipment
PeristriDry type transformer controller,

How much is the power transformerIn the case of dry-type transformer operation there is more noise, and some even cause noise, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.Peristri,PeristriState Grid transformer,Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies,PeristriTechnical parameters of scb12 dry type transformer, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.Haeju,Naturally, if the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.Dry type transformer manufacturerFault judgment of power transformer


PeristriInspection items of oil immersed transformerDefense against varying degrees of chemical variation



Power transformer factoryVisual inspection method for transformer inspectionFault judgment of power transformerPursuit of excellence, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.


PeristriInspection items of oil immersed transformerDefense against varying degrees of chemical variation



Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.technological innovation,Dry type transformer manufacturerHow to select dry-type transformerPower transformers are used in all walks of lifePeristri,The noise of dry-type transformer comes fromIf you want to check the activated carbon fiber for the hanging cover first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body and rotate the crane to place the bell cover on the clean skid.Solenoid insulation deterioration

0 Replies   |  until 2023-05-04 07:01:34 | 90 Views
Log inContent can only be published later