AbbotsfordGrouting anchorApplicable manuals and methods for installation

965HP113924865   ·  2023-01-07 00:43:40   ·   Building materials

The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.Abbotsford, and determine the grouting slurry and its initial concentration.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaHoofddorp,The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel,AbbotsfordSelf propelled hollow grouting anchor manufacturer,AbbotsfordHollow self-propelled anchor rod manufacturer, and the other is as a pipe for grouting at the bottom of the pile. The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.


AbbotsfordGrouting anchorApplicable manuals and methods for installation



The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, so that the soil has better overall shear strength and bending stiffness.CaO·SiO+nHO→CaO·SiO·(n-HO+Ca(OH),The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.Good quality,The use of grouting pipes has become indispensable in modern building construction, because China&#;s ancient buildings are very technical in construction. In China, before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistance


AbbotsfordGrouting anchorApplicable manuals and methods for installation



The length can be matched according to the construction requirements, without loss.Equipment maintenance,The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied. The grouting pipe is a thermoplastic material, which can be processed and formed many times, which provides convenience for the hot-melt and electric fusion connection of the pipe.General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.Abbotsford,Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary,AbbotsfordGrouting seamless pipe, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme. The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation.Plastic pipe plastic pipe has a low acoustic impedance, which is used as a grouting pipe and has a large acoustic transmission rate. It can usually be used for smaller cast-in-place piles. It should be cautious when used in large-scale cast-in-place piles - because large-diameter piles need to be poured with a large amount of concrete, and the hydration heat of cement is not easy to dissipate. In view of the great difference between the thermal expansion coefficient of plastic and concrete, the plastic pipe will shrink radially and longitudinally due to the temperature drop after concrete solidification, It may be separated from the concrete locally to cause air or water crevices, and add more strong reflection interfaces on the sound path, which is easy to cause misjudgment.


5 Replies   |  until 2023-01-07 00:43:40 | 252 Views

Building materials market enjoys building materials company 2023-01-07 08:13:56 support  0 | be opposed to  0

After my personal experience, the reputation of this store is quite good. AbbotsfordGrouting anchor The quality is more like a diamond. Thank you so much!

Pneumatic Hydraulic Components 2023-01-07 08:09:27 support  0 | be opposed to  0

Since searching and shopping online, you never have to go out and wander around. Your AbbotsfordGrouting anchor quality is guaranteed, logistics and delivery are fast, big brands are better than offline stores, and I will review them if necessary in the future!

wooden product 2023-01-07 09:41:17 support  0 | be opposed to  0

Let me evaluate this AbbotsfordGrouting anchor, the price is good, the quality is good, the delivery is good, and the boss is good.

H acid self-produced products 2023-01-07 08:36:44 support  0 | be opposed to  0

Since the last time I bought your AbbotsfordGrouting anchor, this new model has indeed met the standard and is very good, giving you a good comment.

pavement 2023-01-07 07:55:33 support  0 | be opposed to  0

I’ve been too busy lately, the confirmation is late, the quality is good, AbbotsfordGrouting anchor genuine, good quality and cheap, haha.
Log inContent can only be published later