KaiserslauternAnamWhat are the projects

935HP175192871   ·  2024-04-20 01:04:23   ·   Machinery and industry equipment

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator,Kaiserslauternlubbock , all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Kaiserslautern, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged,KaiserslauternZwickau , maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.Imisley,Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.


KaiserslauternAnamWhat are the projects



Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around -mm, and the top layer is not affected. It can be customized according to the location and environment.When charging, it is necessary to charge it in a timely manner. When the equipment is used for about months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is foundSecondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.Welcome to inquire,The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.


KaiserslauternAnamWhat are the projects



With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.Variable cost,Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.The impact load can cause early wear, fracture, and fragmentation of mechanical structural components as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals, and high-pressure oilThe scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform,KaiserslauternRiverside, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and saferKaiserslautern,Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than .m; If the rated speed is not greater than .m/s, the safety distance can be .m.Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.


0 Replies   |  until 2024-04-20 01:04:23 | 43 Views
Log inContent can only be published later