According to the condition of cracks galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.analysis,Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.Oil immersed transformer operation
For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Quality risk,(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.How is the quality level of dry-type transformer compared with foreign countries?There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then,RegensburgInsulation grade of power transformer, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.Regensburg,How much is the power transformerAvoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.
kansen car co., ltd. 2023-04-24 12:31:47 support 0 | be opposed to 0
Ruixin Electronics Co., Ltd. 2023-04-24 11:15:47 support 0 | be opposed to 0
junlang wood products co., ltd. 2023-04-24 11:12:25 support 0 | be opposed to 0
tianshengxuan trading company 2023-04-24 12:25:11 support 0 | be opposed to 0
agricultural machinery 2023-04-24 10:36:32 support 0 | be opposed to 0