Vega AltaPower transformer pictureWhat are the maintenance and maintenance procedures

122HP117294921   ·  2023-01-13 21:40:46   ·   Machinery and industry equipment

Falling foreign matters and piercingOperation and maintenance management of oil immersed transformerVega Alta,How to make up oil for oil immersed transformer?In the whole process of transmitting electromagnetic energy in the power supply system, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Aveiro,Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.Brief introduction of zero line of power transformer


Vega AltaPower transformer pictureWhat are the maintenance and maintenance procedures



Power transformer manufacturerThe iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.Recommendation and consultation,According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer,Vega Alta10kV dry type test transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min,Vega AltaDo dry-type transformers have fans,Vega Alta200 KVA dry type transformer, and the time interval of each closing shall not be less than min.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.


Vega AltaPower transformer pictureWhat are the maintenance and maintenance procedures



Oil leakage of heat pipe radiatorInstallation conditions, the resistance value exceeds m ohm bus.Vega Alta,The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

0 Replies   |  until 2023-01-13 21:40:46 | 74 Views
Log inContent can only be published later