ciudad obregon Precision tubeManufacturers have strong willingness to pull up businesses

263HP145816628   ·  2023-01-12 20:07:45   ·   Electronic Component

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,ciudad obregon Steel pipe, aerated silicification method and electric double liquid silicification method.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.

ciudad obregon Precision tubeManufacturers have strong willingness to pull up businesses


A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them, the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.ciudad obregon Precision tubeManufacturers have strong willingness to pull up businesses,2023-01-1220:07:45Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer old brand, price advantage and quality! Each time it is used up,ciudad obregon Grouting pipe, the pipe core and the outer wall of the pipe shall be washed clean.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.

ciudad obregon Precision tubeManufacturers have strong willingness to pull up businesses


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Push the rock powder and sundries that are not washed,ciudad obregon Seamless pipe, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.ciudad obregon ,Isilemurino,The grouting mechanism includes filling grouting, infiltration grouting, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, high chemical grouting method and cement grouting method.

2 Replies   |  until 2023-01-12 20:07:45 | 133 Views

Leather Goods 2023-01-12 20:44:50 support  0 | be opposed to  0

Good seller, ciudad obregon Precision tube things are very good. Come back in the future. You can buy with confidence.

denitrification 2023-01-12 20:34:17 support  0 | be opposed to  0

ciudad obregon Precision tube Not bad, the price is worth it, just right.
Log inContent can only be published later