St. Peter lieuLeading small catheterHow to avoid the impact at work

965HP113924865   ·  2024-04-22 00:32:04   ·   Building materials

The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation. The length can be matched according to the construction requirements, without loss.St. Peter lieu,[specific embodiment] [] the following describes the utility model in combination with the attached specific embodiments.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?Oxford, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead. The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved which is not considered in the structural stress calculation.


St. Peter lieuLeading small catheterHow to avoid the impact at work



The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use. Rigid inner core: it will not be flattened under concrete pressure to ensure smooth grouting channel.In recent years, there have been frequent natural disasters, such as mountain slides floods, earthquakes, fires, etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles or manually.How much is it,When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture.The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.


St. Peter lieuLeading small catheterHow to avoid the impact at work



The main elastic element of the grouting pipe is the stainless steel grouting pipe,St. Peter lieuTunnel leading small conduit and pipe shed, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.Welcome to inquire,The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect,St. Peter lieuLeading small conduit manufacturer, so that the soil has better overall shear strength and bending stiffness. Squeeze grouting or split grouting: depending on the grouting pressure, the grout is forced to open various channels in the underground layer to squeeze into the stratum. The grout is mostly consolidated in a vein or a tree shape. This grout can squeeze the soft bottom layer tightly, so it is also called compaction grouting in foundation reinforcement. Displacement grouting: the soil and sand in the injected stratum are forced out through certain methods, and the space formed is filled with grout, It is called displacement grouting High pressure mass injection grouting: the kinetic energy of jet flow is used for grouting.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?St. Peter lieu,It is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, it forms an efficient stress transmission mechanism, so that the local load can quickly and effectively spread to the large area of soil, so as to reduce the local failure stress and improve the service life of the project. The convex joint steel plastic grouting pipe is an upgraded product of the ordinary steel plastic grouting pipe, which changes the shortcomings of the ordinary grouting pipe, such as the small peeling force of the joint (n), the easy cracking of the welding point, the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology, the peeling force of the welding joint is between N and N, which effectively changes the above shortcomings of the traditional steel plastic grouting pipe. Because of the protruding joints at the welding position, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment, polyethylene (PE) and other additives,St. Peter lieuSmall conduit support, and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, it is a high-strength reinforced geotextile. This single belt is woven or sandwiched at a certain distance longitudinally and horizontally, and is formed by welding its junction with the fusion welding technology of special reinforcement bonding. The grouting pipe is set out from the inner ring tap in the vertical setting out state, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur.When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation

0 Replies   |  until 2024-04-22 00:32:04 | 21 Views
Log inContent can only be published later