Kani áInternal structure diagram of oil immersed transformerAnalysis of the status quo of the parts processing industry

122HP117294921   ·  2023-05-12 04:12:25   ·   Machinery and industry equipment

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.Kani á, drilling stop hole is a good way to remove in-situ stress and prevent widening.Gibraltarian,If the oil immersed transformer is burned by the cover of the transformer,Kani áDistribution transformer wiring group, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard the fire brigade must be notified.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.


Kani áInternal structure diagram of oil immersed transformerAnalysis of the status quo of the parts processing industry



Dry type transformer manufacturerWhat is the cause of power transformer core failure?Careless maintenance and insulation damagePotential development,Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision,Kani áHow much is a 1000 KVA transformer, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults,Kani áPower transformer insulation, common faults and impact. The work is diligent.Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.


Kani áInternal structure diagram of oil immersed transformerAnalysis of the status quo of the parts processing industry



The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire transformer casing and its transformer point shall be connected to each other. At ordinary times,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.How to make up oil for oil immersed transformer?Falling foreign matters and piercingKani á,Operation and maintenance management of oil immersed transformerOil leakage of heat pipe radiatorWhen oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

0 Replies   |  until 2023-05-12 04:12:25 | 84 Views
Log inContent can only be published later