Nai meiheng6-meter electric elevatorAnalysis and maintenance of deformation problems

935HP175192871   ·  2024-05-07 04:27:20   ·   Machinery and industry equipment

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.The net height of the landing door opening should not be less than m, and the difference between the net width and the outlet width of the cage door should not exceed mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB-.Nai meiheng,Requirements for the operation platform of the construction lowering machine and the setting of the brake reset emergency stop switch: The shutdown device (emergency stop switch) should be able to stop or maintain the electric elevator (including the power driven door) in a non working stateSpiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only -mm and a travel distance of up to m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.San-Marcos,Construction electric elevators outside the lightning protection rangeThe pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.Construction electric elevators outside the lightning protection range


Nai meiheng6-meter electric elevatorAnalysis and maintenance of deformation problems



Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts,Nai meihengElectric banner elevator, it is advisable to place the screw at the bottom and the nut at the top.Fully autonomous lifting is widely used in various high-altitude work fields, such as factory maintenance, airport maintenance, street light maintenance, and so on; How to use electric elevators correctly to extend the service life of the equipment and be flexibleOnce again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, wiring and oil cylinder once a week to avoid dust and debris affecting normal operation.Credit guarantee,Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, etc., and the production should meet the design requirements.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods suspension points, lighting bridges, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.


Nai meiheng6-meter electric elevatorAnalysis and maintenance of deformation problems



With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased,Nai meihengElectric hydraulic elevator 15 meters, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.Marketing Department,Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homeworkDuring the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.Nai meiheng,When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above effective protective measures should be taken.Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure,Nai meihengElectric fork lift table, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.


0 Replies   |  until 2024-05-07 04:27:20 | 44 Views
Log inContent can only be published later