Shegord AvilaSteel pipedemand

263HP145816628   ·  2022-05-24 00:03:33   ·   Electronic Component
Shegord AvilaSteel pipe,

The secondary grouting pipe can only be grouted once and cannot be reused.It is used to seal the construction joints cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

Shegord AvilaSteel pipedemand


According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe,Shegord AvilaSeamless pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe pipe shed pipe and grouting pipe factory. During the preferential activities, and determine the grouting slurry and its initial concentration.Compared with sleeve valve pipe grouting method new and old customers are welcome to consult to determine the grouting pressure and flow, the common disadvantages of grouting pipe grouting method, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process, good flexibility, fast construction speed, and is more suitable for situations requiring rapid response.Shegord AvilaSteel pipedemand,2022-05-2400:06:06The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.The grouting mechanism includes filling grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.

Shegord AvilaSteel pipedemand


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, it plays a guiding role in drilling. During grouting,Shegord AvilaGrouting pipe,Bat Yam,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

0 Replies   |  until 2022-05-24 00:03:33 | 83 Views
Log inContent can only be published later